Skip to content
A kitchen with its original cabinets repainted and new counters, the kind of remodeling we offer in Spring Hill

Remodeling at home in Spring Hill, FL

Spring Hill bathroom and kitchen remodeling, taken as far as you want it

Picture new tile, a different vanity, shiny fixtures, recoated cabinets and a floor you would gladly show off — or the entire bath torn back to bare framing, sealed against water and rebuilt. How far it goes is your call.

Each line item is on paper first, and relocating plumbing or wiring is handed to a licensed trade we bring in for that portion.

Layout stays

Fixtures swapped in place

Refresh or remodel

As far as you want to take it

One price

Whole room, in writing

Realistic timeline

Given before we start

Spring Hill remodeling, two ways

Refit or rebuild: how our remodeling works in Spring Hill

For us, bathroom remodeling in Spring Hill comes in two sizes. A refresh leaves the layout alone and swaps out everything you look at: tile, vanity, faucet, toilet, floor and paint.

A full job strips the room to the studs, puts a waterproof membrane across floor and walls, gets leak-tested while you watch, and is rebuilt from there. Kitchens nearly always land on the refresh side — cabinets repainted where they hang, a new backsplash, a new floor — and no room in the house gives more back for the money.

Whichever size it is, the price comes itemized and on paper before day one, and materials are billed at cost, every receipt stapled to the bill. Relocating plumbing or wiring is not ours to do, so a licensed trade we arrange takes that portion.

There is no Florida license for handymen, and we neither hold nor claim a state construction license; we take on the work the rules allow and coordinate everything past that line.

We set the Spring Hill tile work ourselves, along with the new bathroom flooring. The kitchen and bath paint is ours as well. Remodeling jobs run from Spring Hill out across remodeling stops in Hernando County and northern Pasco.

Vanity and lit mirror installed on the old supply and drain, a Spring Hill remodeling example
Vanity and mirror swapped in where the old plumbing already ran

What we do in the room

The parts of a room that make it read as new

A refresh changes the surfaces you see and handle every day. Relocating a drain, a water line or a circuit falls to a licensed trade we coordinate, and the quote spells that out up front.

Grey large-format tile finished tight to a white tub edge, bathroom remodeling for Spring Hill homes

Kitchen splash walls and shower surrounds in tile

Wall tile in the spots that take the abuse: behind the range, along the counter run, around the tub and up the shower walls, all over a substrate we check first.

Vanity and lit mirror installed on the old supply and drain, a Spring Hill remodeling example

Sinks, faucets and the vanity under them

A fresh vanity and top hooked to the drain and supply already in the wall, plus a new faucet and mirror.

Cabinet frames taped off and spray-finished where they hang, kitchen remodeling we do in Spring Hill

Sprayed cabinets, boxes left on the wall

We pull the doors, sand them, prime them and spray them, then hang them on new hinges with new pulls. Nothing else changes a tired kitchen as much per dollar.

Finished bath with a white vanity standing on marble-pattern tile, a Spring Hill bathroom remodeling style

Wet-room floors that shrug off a splash

The old floor comes up, and waterproof vinyl plank or tile goes down on the slab, with the transitions and trim finished cleanly.

Sliding glass shower door hung in a completed bath, part of the remodeling we do around Spring Hill

Toilets, showers and doors

A toilet traded for a new one, a new shower door, and curtain rods anchored into framing.

Fresh white baseboard and door casing against a dark wood floor, finish carpentry for Spring Hill remodels

Paint, trim and the small stuff

Ceiling and walls repainted, new caulk lines, towel bars, hooks, cover plates and the little finishing touches.

Stripped to the studs

A full bathroom, step after step

Gutting a bathroom to the framing and rebuilding it keeps the pair of us busy for close to ten weekdays. Below is the sequence we follow, including the steps we refuse to cut.

  1. First

    Demo and haul-away

    Floor runners laid from the entry, tarps covering what stays, and a HEPA air scrubber going. The old tile, tub surround and fixtures are removed and hauled off.

  2. Then

    Membrane on, then a leak test

    Membrane across the floor and up each wall, with every corner sealed. You see the test result before any tile is set.

  3. Then

    Laying the tile, any size

    Large-format pieces need heavier tools and add a bit of time. Milena back-butters each piece while Jeff cuts and sets.

  4. Then

    Vanity, toilet, fixtures

    Connected to the lines already there. If a line has to go somewhere new, a licensed trade we schedule does that part.

  5. Then

    Primer and mildew-resistant coats

    The walls get smoothed out before any color. Then two primer coats and two mildew-resistant topcoats over walls and ceiling.

  6. Last

    Final bill, with the receipts

    Your balance arrives alongside each material receipt, and the room is swept and wiped down before we pack up.

Relocated drains, supply lines and circuits belong to a licensed trade; we handle the scheduling. See the exact boundary of our Spring Hill handyman work.

From photos to a start date

Photos, a written price, then one start date

Plenty of refresh quotes begin with a handful of room photos and a note on what you would change first.

01

Pictures of the room and your list

Shoot the full room plus the corners that bug you most. Mention your town and anything you have already purchased.

02

Itemized price, in writing

A single written figure for the refresh, and any licensed-trade items listed on their own lines so nothing catches you off guard.

03

A realistic timeline

The schedule is agreed before the first day. Then we cover the rest of the house, work through the steps in sequence and hand back a room that feels brand new.

Finished jobs

Kept layouts, new finishes

Actual projects, done start to finish by the two owners themselves. Bathroom and kitchen clients have reviewed us on Google and Angi.

An older kitchen brightened by refinished cabinets, the kitchen remodeling we bring to Spring Hill

Kitchen carcasses kept, doors refinished, new hardware

The cabinet boxes never left the wall. Each door was removed, sanded, primed and spray-coated, fitted with new pulls and rehung within a few days.

Updated bath with a new vanity and a mosaic tile stripe, bathroom remodeling offered in Spring Hill

Bathroom update on the existing plumbing

A mosaic tile band, a vanity and a faucet hooked to the original lines, and fresh paint on the walls.

Bathrooms We’ve Done

Start-to-finish boards

Gallery: two bathrooms, start to finish

Jeff prefers presenting each finished bathroom as one board, demolition shots first and the reveal last. Florida bathrooms will be pinned here as each one is completed.

Photo board of a compact bath getting a new tub surround, tile and vanity, like remodels we quote in Spring Hill

A small bath: tub, tile, vanity

The tub surround, vanity and fixtures were replaced in their original spots, and the walls were waterproofed before any finish went up.

Photo board of another bath with new tile, glass and fixtures, Spring Hill bathroom remodeling reference

Another bath, same approach

New tile, new glass and new fixtures, each one going back where the old one sat.

Asked before we start

Remodeling FAQs from Spring Hill homeowners

How much demolition is needed for my kitchen or bathroom remodel?

It depends on what we’re remodeling and what’s already there. M&J Home Services doesn’t automatically tear everything down to the studs if it isn’t necessary — but we also won’t simply cover over a surface that isn’t suitable for the new installation.

For a kitchen backsplash, if there is currently no tile, we inspect and prepare the existing wall, repair any imperfections, create a smooth surface, prime where appropriate, and then install the new tile with the proper setting material and grout.

If we’re removing an existing tile backsplash, the drywall behind it is often damaged during demolition. When that happens, we replace the damaged drywall rather than trying to patch over a wall that is no longer a good foundation for new tile. The new wall surface is properly finished and prepared before the new backsplash is installed.

The same principle applies to bathroom walls. If we’re removing old tile from a half-wall or other tiled area, we inspect what’s underneath and replace damaged wallboard as necessary.

If you want painted walls instead of new tile, we prepare the new and existing wall surfaces, repair imperfections, finish the seams, prime as needed, and paint so everything blends together properly.

For a complete shower or tub surround, we normally remove the existing wall materials down to the studs. That lets us check what’s hiding behind the walls and build the new shower on a correctly prepared base.

We then install an appropriate waterproof backer system, such as GoBoard or a cement backer-board system with the proper waterproofing, carefully treating seams, corners, fasteners, and penetrations before installing the new tile.

Every remodel is different. We only remove what needs to come out — but when something needs to be replaced to do the job correctly, we don’t cover it up. Our goal is to give your new finishes a solid, properly prepared foundation that we can stand behind.

Can you move a sink or add an electrical outlet?

Yes, those changes can usually be incorporated into a bathroom or kitchen remodel, but some plumbing and electrical work must be performed by appropriately licensed professionals when required by Florida or local regulations and permitting requirements.

M&J Home Services can handle the remodeling work surrounding those changes — such as demolition, opening and repairing walls, cabinetry, drywall, tile, flooring, painting, fixture installation where permitted, and putting everything back together once the licensed trade work is completed.

For plumbing, replacing certain existing fixtures in the same location may be different from relocating plumbing. If your project requires moving a sink, shower valve, drain, water lines, or other plumbing to a new location, we will identify that during planning and coordinate the project so a properly licensed trade completes the plumbing piece that the rules require.

The same applies to electrical work. If your remodel requires a new outlet, moving an outlet, adding a circuit, relocating wiring, or other electrical modifications, that portion of the project should be completed by a licensed trade when required. M&J Home Services stays out of electrical work entirely.

You don’t have to give up on a design because plumbing or electrical needs to move. We simply plan the project correctly, make sure the appropriate licensed professional handles that portion of the work, and then continue with the remodeling work once it’s ready.

How long does a bathroom remodel take?

The timeline depends on the scope of the project. Not every bathroom remodel is the same, so we don’t like giving every customer a generic “one-week” answer.

A straightforward tub-to-tub, shower-pan-to-pan, or similar replacement can usually be completed faster because we’re keeping much of the existing layout in place.

A custom shower takes longer. If we’re building a custom mud shower pan, the pan itself can require approximately three days because there are multiple steps involved, including proper preparation, waterproofing, required curing time, and testing where applicable.

For a typical full tiled shower, the shower portion may take approximately 4-6 working days, depending on the size, tile pattern, niches, benches, waterproofing system, shower doors, and other details.

A complete bathroom transformation involving demolition, shower or tub work, flooring, vanity, drywall repairs, painting, fixtures, trim, and finishing details may take approximately one to two weeks, sometimes longer depending on the scope of work and what we discover during demolition.

Custom tile patterns, special-order materials, inspections, any licensed-trade work on pipes or wiring, unexpected damage behind walls or floors, and customer-requested changes can also affect the schedule.

You’ll have a realistic estimated schedule for your own bathroom before any work begins. We’d rather allow the proper time for waterproofing, curing, preparation, and craftsmanship than rush through steps just to finish a bathroom faster.

Do I choose the tile and vanity, or do you?

Either way works. Some homeowners know exactly what they want and enjoy selecting every tile, vanity, fixture, and finish themselves.

Others know they want a beautiful new bathroom but aren’t sure where to begin. M&J Home Services is happy to work with both.

If you’d like to make the selections yourself, we can recommend places to shop and help you determine the proper sizes, quantities, materials, and products for your project. Before you purchase something, you’re also welcome to ask our opinion to make sure it’s appropriate for the installation.

If you’re having trouble deciding, we can help with that too. When arranged in advance, we can meet you at a tile or home-improvement store and help you look at tile, vanities, colors, finishes, and other products. These shopping appointments would typically be scheduled at a mutually convenient time before your project begins.

We can also help you coordinate different selections so the tile, flooring, vanity, countertop, fixtures, grout, paint colors, and finishes work well together.

It’s your bathroom and the final decisions are always yours. Our job is to give you guidance when you want it, help you avoid products that may not be a good fit, and make the selection process a little less overwhelming.

Do I need a complete bathroom remodel, or can I just update what I have?

Not every bathroom needs to be completely torn apart to make a big difference. If the shower or tub, flooring, walls, and other major components are still in good condition, a bathroom refresh may be a more practical and affordable option.

Sometimes replacing the vanity, countertop, faucets, toilet, mirror, shower door, hardware, accessories, flooring, or paint can completely change the appearance of the room without requiring a full remodel.

We can also refresh existing tile by addressing deteriorated grout or caulk and replacing damaged components where appropriate.

On the other hand, if the bathroom has water damage, failing tile, an outdated shower or tub, damaged walls or flooring, poor waterproofing, or a layout that no longer works for you, investing in a more complete remodel may make better sense than putting new finishes over existing problems.

M&J Home Services will look at what you already have and discuss what you actually want to change.

We’re not going to recommend tearing out a perfectly good bathroom just because we can. If a refresh can give you the result you want, we’ll tell you. If we believe a complete remodel would be the better long-term investment, we’ll explain why.

The goal is to spend your remodeling budget where it makes the biggest difference — not replace things that don’t need replacing.

Circular M&J emblem printed with our motto, beside Spring Hill bath and kitchen remodeling

Tired of the room? A picture is enough to start.

You get the price on paper, you owe nothing for it, and we pencil in a start only if you ask.

Contact

Rolling out of Spring Hill to homes in Hernando and Pasco

Call today

888-585-3266

Answered into the late evening, near 11, seven days running. While Jeff has his hands full on site, an AI answering service fields the common questions, yet the only people who ever come to your house are Jeff and Milena.

Email

jeff@mjhomeservicestampa.com

Room photos and wish lists can come here as well

Based in

Spring Hill, FL 34606

No showroom; the estimate happens in your house

Areas