Skip to content
Completed bath showing a mosaic glass stripe over a replaced vanity and a glass tub door, the finish we bring to Land O' Lakes, FL

Central Pasco lake country · baths and kitchens

Kitchen & Bath Remodeling for Homes near Land O’ Lakes, FL

We remodel bathrooms and kitchens for Land O’ Lakes households, from the many older lake houses around Lake Padgett out to the newer streets of Connerton and Bexley. Keep reading for what a finished bath really contains, the order the work follows, and how the price is put on paper before day one.

Steam-proofed

Membranes for humid baths

Forty-minute drive

South on the Suncoast Parkway

Owners only

Milena and Jeff, hands on

At cost

Every material receipt shown

Worked example

Hypothetical lake-house bathroom, scoped from tear-out to paint

A lake-house bathroom project runs from bare studs to final paint, and the example below is pieced together from requests we hear around the lakes. Treat it as a sketch, not an old invoice, since our Pasco County work has only just begun.

Imagine a hall bath in a 1980s home near Lake Padgett with cracked tile around the tub, a vanity base puffed up after years of muggy summers, and floor tile lifting next to the toilet.

What that sketch would cover:

  • tile and board around the tub stripped to the studs
  • walls and floor membraned and leak-tested
  • fresh porcelain on the walls with a niche
  • vanity, top and faucet hooked to the existing lines
  • a new toilet where the old one sat, plus new floor tile
  • primer twice and paint twice

Plan on a week or two of weekday work, occasionally more, with each item priced separately.

Kitchens around the lakes usually need less: repainted cabinets, a backsplash and a new floor tend to do it.

Putting it in writing first is what our Land O’ Lakes remodeling is built around, and the complete list of what we take on lives with our Spring Hill bath and kitchen remodeling.

Grey stone-look porcelain landing neatly on a white replacement tub, a bath finish for Land O' Lakes homes
Clean stop where the wall tile reaches a replacement tub

What you end up with

Visible results in a Land O’ Lakes bathroom or kitchen once we leave

Every card here is something you can point at once we pack up. Moving a drain or a circuit belongs to a licensed trade and carries a separate price, since we never touch electrical work ourselves.

Florida has no handyman license, and we don’t hold or advertise a state construction license.

White-tiled shower walls over a new base with a recessed niche, fixtures not yet installed, for Land O' Lakes bathrooms

Dry framing behind the bathroom shower

GoBoard or cement backer, then membrane, then a leak test, then tile, in that order. Lake-area humidity tends to find any shortcut.

Marble-look tile floor under a white vanity, a completed bath for Land O' Lakes homeowners

Swollen base, replaced

The puffed-up cabinet goes, and a new base and top take its spot on the same supply and drain.

Kitchen cabinetry covered in masking film for spraying on the wall, a cabinet refinish for Land O' Lakes kitchens

Boxes stay, doors get sprayed

The boxes are sanded, primed and sprayed where they hang. The doors come off for the same treatment and go back up on new hinges and pulls.

Clip-levelled hallway floor tile resting while the mortar cures, the same flat floor we lay in Land O' Lakes bathrooms

No lifted edges underfoot

Loose or cracked tile is replaced on a base we’ve checked, with clips holding each edge flush so it sits smooth underfoot.

Tub shower closed in with sliding glass and fitted with a grab bar, bathroom remodeling for Land O' Lakes

Sliding door, grab bars, new toilet

Glass that slides, bars screwed into the framing, and a replacement toilet seated in the original spot.

Hand-cut paint line at the ceiling, extension roller beside it, bathroom painting for Land O' Lakes homes

Ceiling paint to finish

Fresh white overhead, reached from a long pole with a brushed edge along the walls, often closes out a remodel.

Order of work

Downtime for a Land O’ Lakes bathroom, stage by stage

A complete rebuild keeps the bathroom out of action for about one to two working weeks, weekdays only and sometimes longer, which is normal for a Land O’ Lakes remodeling job of that size. The order is below, with the checks a humid house never gets to skip.

  1. Opening

    Strip to framing

    Plastic and runners laid, the scrubber switched on, then tile, board and fixtures removed.

  2. Walls open

    Inspect the open walls

    Damp studs or mold found behind the old tile get photographed and priced for you before anything is covered.

  3. Before tile

    Membrane and test

    Floor and walls wrapped in membrane, each seam and corner sealed, then a leak test you can stand and watch.

  4. Longest stretch

    Walls, then floor

    Wall tile goes up before the floor tile, with Milena back-buttering each piece as Jeff cuts and sets. On its own, a full tiled shower is roughly a four-to-six-workday stretch.

  5. Near the end

    Hook-ups and coats

    The vanity and toilet connect to the lines already there, and the primer and paint follow.

  6. Handover

    Clean-up and handover

    Glass door hung, accessories and caulk done, the room cleaned and the receipts passed to you.

Treat that order as a guide rather than a guarantee; anything hiding in the wall reaches you in writing before we act on it. Any plumbing that has to move goes to a licensed trade, as set out in the Land O’ Lakes handyman licence table.

The quote

Firm remodeling prices for lake-area owners, in three steps

Photos, a free measure, then a written and itemized remodeling price for your Land O’ Lakes home. Nothing gets added to it unless you sign off.

01

Pictures from you

A wide shot of the room, close-ups of any damage, and whatever you’ve already purchased for it.

02

Measuring at the house

Often an evening or a Saturday. Jeff looks over the floor and walls and checks how the tub was installed.

03

Priced item by item

Tear-out, repairs, tile, fixtures, paint and haul-away all carry their own figure, with licensed-trade work marked separately.

Proof from earlier jobs

Moisture-minded jobs we finished with our own hands

Both are rooms we actually completed.

Bath refresh with a glass mosaic course at counter level and a replaced top, a lighter option for Land O' Lakes homes

Refreshed, tub untouched

New tile band, vanity and faucet with the tub left alone, costing a fraction of a complete rebuild.

Rebuilt shower wall in large stone-look porcelain with a set-in niche, a full rebuild for Land O' Lakes bathrooms

Studs-up shower wall

Opened to the framing, sealed, tested, then tiled from floor to ceiling around a niche built between the studs.

Bathrooms We’ve Completed

Where they started

Then-and-now boards: a backsplash and a shower

Jeff put each board together himself and left the starting photos in, so the change is easy to judge.

Two-stage board of a kitchen wall going from bare to mosaic tile behind the range, backsplash work for Land O' Lakes

Mosaic behind the stove

Tile run behind the range and along the counters, with clean stops where it meets the cabinets.

Two-stage board of a cramped bath reworked with a white shower base, a grey mosaic band and a new vanity, for Land O' Lakes homes

Cramped bath, now walk-in

A walk-in base, walls in grey mosaic and a new vanity took over from a tight old bathroom.

Questions from the lakes

Humidity, deposits, tile picks: Land O’ Lakes remodeling questions

Does a rebuilt bath cope with lake humidity better than the original?

It should, and that’s why we membrane and leak-test. Moisture and steam are kept on the tile side, and walls and ceiling get a mildew-resistant paint.

A fan that actually pulls air after showers still counts for a lot, and we’ll let you know if yours is weak.

Can I pick out the tile and vanity on my own?

Yes, or we can help. We’ll suggest where to shop, work out sizes and quantities, and give an honest opinion before you buy anything.

Book it with us ahead of time and we’ll go through a tile showroom or home center together before the start date. The decisions stay yours.

How much is due up front?

Half the price reserves your dates on a bath or kitchen job, and the other half is paid at the finish along with every material receipt.

Zelle, cash and checks all work; cards are fine too, with a small processing fee added.

Is it possible to save the tub and just retile the walls?

In many cases. When the tub is solid and level, we cover it, remove the walls and build a new surround around it. Sometimes the wall tile is fine too, and regrouting plus fresh caulk is all the room needs.

If it’s chipped or the drain is giving out, we’ll explain why replacing it during the job is the smarter move.

Whose hands are on the job inside our home?

Milena’s and Jeff’s, the two owners. Nobody gets sent in as a stand-in.

A licensed trade shows up only for changes to plumbing or wiring, and you’ll know about it before that day comes.

M&J Home Services seal next to our Land O’ Lakes remodeling call to action

Sketching out a new Land O’ Lakes bathroom?

Email pictures and a quick wish list for the Land O’ Lakes remodeling you have in mind. Back comes an itemized figure on paper, and you’re not committed to anything.

Contact

Lines open for Land O’ Lakes remodeling calls

Call

888-585-3266

Answered as late as 11 pm. Mid-tile, Jeff lets an AI answering service take the routine questions for him.

Email

jeff@mjhomeservicestampa.com

Rough room dimensions alongside the photos speed up a first price.

Base

Spring Hill, FL 34606

The Suncoast Parkway gets us there in about forty minutes.

Coverage

Land O’ Lakes · Lutz · Odessa

The lake district of central Pasco