Worked example
Hypothetical lake-house bathroom, scoped from tear-out to paint
A lake-house bathroom project runs from bare studs to final paint, and the example below is pieced together from requests we hear around the lakes. Treat it as a sketch, not an old invoice, since our Pasco County work has only just begun.
Imagine a hall bath in a 1980s home near Lake Padgett with cracked tile around the tub, a vanity base puffed up after years of muggy summers, and floor tile lifting next to the toilet.
What that sketch would cover:
- tile and board around the tub stripped to the studs
- walls and floor membraned and leak-tested
- fresh porcelain on the walls with a niche
- vanity, top and faucet hooked to the existing lines
- a new toilet where the old one sat, plus new floor tile
- primer twice and paint twice
Plan on a week or two of weekday work, occasionally more, with each item priced separately.
Kitchens around the lakes usually need less: repainted cabinets, a backsplash and a new floor tend to do it.
Putting it in writing first is what our Land O’ Lakes remodeling is built around, and the complete list of what we take on lives with our Spring Hill bath and kitchen remodeling.

What you end up with
Visible results in a Land O’ Lakes bathroom or kitchen once we leave
Every card here is something you can point at once we pack up. Moving a drain or a circuit belongs to a licensed trade and carries a separate price, since we never touch electrical work ourselves.
Florida has no handyman license, and we don’t hold or advertise a state construction license.

Dry framing behind the bathroom shower
GoBoard or cement backer, then membrane, then a leak test, then tile, in that order. Lake-area humidity tends to find any shortcut.

Swollen base, replaced
The puffed-up cabinet goes, and a new base and top take its spot on the same supply and drain.

Boxes stay, doors get sprayed
The boxes are sanded, primed and sprayed where they hang. The doors come off for the same treatment and go back up on new hinges and pulls.

No lifted edges underfoot
Loose or cracked tile is replaced on a base we’ve checked, with clips holding each edge flush so it sits smooth underfoot.

Sliding door, grab bars, new toilet
Glass that slides, bars screwed into the framing, and a replacement toilet seated in the original spot.

Ceiling paint to finish
Fresh white overhead, reached from a long pole with a brushed edge along the walls, often closes out a remodel.
Order of work
Downtime for a Land O’ Lakes bathroom, stage by stage
A complete rebuild keeps the bathroom out of action for about one to two working weeks, weekdays only and sometimes longer, which is normal for a Land O’ Lakes remodeling job of that size. The order is below, with the checks a humid house never gets to skip.
- Opening
Strip to framing
Plastic and runners laid, the scrubber switched on, then tile, board and fixtures removed.
- Walls open
Inspect the open walls
Damp studs or mold found behind the old tile get photographed and priced for you before anything is covered.
- Before tile
Membrane and test
Floor and walls wrapped in membrane, each seam and corner sealed, then a leak test you can stand and watch.
- Longest stretch
Walls, then floor
Wall tile goes up before the floor tile, with Milena back-buttering each piece as Jeff cuts and sets. On its own, a full tiled shower is roughly a four-to-six-workday stretch.
- Near the end
Hook-ups and coats
The vanity and toilet connect to the lines already there, and the primer and paint follow.
- Handover
Clean-up and handover
Glass door hung, accessories and caulk done, the room cleaned and the receipts passed to you.
Treat that order as a guide rather than a guarantee; anything hiding in the wall reaches you in writing before we act on it. Any plumbing that has to move goes to a licensed trade, as set out in the Land O’ Lakes handyman licence table.
The quote
Firm remodeling prices for lake-area owners, in three steps
Photos, a free measure, then a written and itemized remodeling price for your Land O’ Lakes home. Nothing gets added to it unless you sign off.
01
Pictures from you
A wide shot of the room, close-ups of any damage, and whatever you’ve already purchased for it.
02
Measuring at the house
Often an evening or a Saturday. Jeff looks over the floor and walls and checks how the tub was installed.
03
Priced item by item
Tear-out, repairs, tile, fixtures, paint and haul-away all carry their own figure, with licensed-trade work marked separately.
Proof from earlier jobs
Moisture-minded jobs we finished with our own hands
Both are rooms we actually completed.

Refreshed, tub untouched
New tile band, vanity and faucet with the tub left alone, costing a fraction of a complete rebuild.

Studs-up shower wall
Opened to the framing, sealed, tested, then tiled from floor to ceiling around a niche built between the studs.
Bathrooms We’ve Completed






Bathrooms 1–3 · 6
Where they started
Then-and-now boards: a backsplash and a shower
Jeff put each board together himself and left the starting photos in, so the change is easy to judge.

Mosaic behind the stove
Tile run behind the range and along the counters, with clean stops where it meets the cabinets.

Cramped bath, now walk-in
A walk-in base, walls in grey mosaic and a new vanity took over from a tight old bathroom.
Questions from the lakes
Humidity, deposits, tile picks: Land O’ Lakes remodeling questions
Does a rebuilt bath cope with lake humidity better than the original?
It should, and that’s why we membrane and leak-test. Moisture and steam are kept on the tile side, and walls and ceiling get a mildew-resistant paint.
A fan that actually pulls air after showers still counts for a lot, and we’ll let you know if yours is weak.
Can I pick out the tile and vanity on my own?
Yes, or we can help. We’ll suggest where to shop, work out sizes and quantities, and give an honest opinion before you buy anything.
Book it with us ahead of time and we’ll go through a tile showroom or home center together before the start date. The decisions stay yours.
How much is due up front?
Half the price reserves your dates on a bath or kitchen job, and the other half is paid at the finish along with every material receipt.
Zelle, cash and checks all work; cards are fine too, with a small processing fee added.
Is it possible to save the tub and just retile the walls?
In many cases. When the tub is solid and level, we cover it, remove the walls and build a new surround around it. Sometimes the wall tile is fine too, and regrouting plus fresh caulk is all the room needs.
If it’s chipped or the drain is giving out, we’ll explain why replacing it during the job is the smarter move.
Whose hands are on the job inside our home?
Milena’s and Jeff’s, the two owners. Nobody gets sent in as a stand-in.
A licensed trade shows up only for changes to plumbing or wiring, and you’ll know about it before that day comes.
Beyond the bath
Laundry rooms, bedrooms and halls that join a Land O’ Lakes bath job
Flooring and painting come up most, since our tools are already in the house. Closer to the Gulf, owners planning New Port Richey kitchen and bath updates tend to add rooms the same way.
Laundry floors and backsplashes
Kitchen backsplashes and laundry-room floors in a Land O’ Lakes home, tiled while the bathroom cures.
Damp-tolerant plank
Waterproof vinyl plank installed on the slab through hallways and bedrooms in Land O’ Lakes homes.
Colors that tie in
Halls and bedrooms repainted to go with the new bathroom, ceilings and all.
Sketching out a new Land O’ Lakes bathroom?
Email pictures and a quick wish list for the Land O’ Lakes remodeling you have in mind. Back comes an itemized figure on paper, and you’re not committed to anything.
Contact
Lines open for Land O’ Lakes remodeling calls
Call
Answered as late as 11 pm. Mid-tile, Jeff lets an AI answering service take the routine questions for him.
jeff@mjhomeservicestampa.com
Rough room dimensions alongside the photos speed up a first price.
Base
Spring Hill, FL 34606
The Suncoast Parkway gets us there in about forty minutes.
Coverage
Land O’ Lakes · Lutz · Odessa
The lake district of central Pasco